Installation
The KNIGHT
2
must be installed by a designated installation facility by qualied personnel only. All
safety precautions must be thoroughly understood before installation. Please consult the factory for
additional installation information assistance.
Installation Kit
Included with the KNIGHT
2
is an installation kit. Verify that the kit contains the following items:
(1) 50 feet of 2GA-2 Conductor power cable (1) 50 feet of 22GA-20 conductor cable
(1) Pre-wired HOLSTER BOX w/cover (1) Handheld Controller
(1) Small hardware parts bag with:
(4) mounting spacers (4) 5∕16-18 x 2 ½" bolts
(4) 5∕16-18" nylon lock nuts (8) 5∕16" at washers
(4) large diameter at washers (2) ¼-20 x 5∕8" Phillips pan head machine screws
(4) ¼" at washers (2) ¼-20 nylon lock nuts
(3) ½" 90° sealing connector w/nut (1) 1” 90° sealing connector w/ nut
Tools Required
Lifting device (crane, forklift, block and tackle, etc.)
Sling for lifting
Drill
21/64", 17/64" drill bits
Hole punch for metal with 7/8" and 15/16" diameter capacity
Phillips head screwdriver, #2
Command Light at blade screwdriver (included with light)
7/16" and 1/2" combination wrenches and/or ratchet and 7/16" and 1/2" sockets
8" adjustable wrench
Tongue and Groove Pliers
Wire stripper or razor blade knife
Solder-less wire connector crimp tool
Silicone based gasket sealer, RTV™ recommended
Installation Notes
The KNIGHT
2
weighs approximately 165 pounds. Use mechanical assistance to lift the light into
installation position such as a forklift or crane.
Use the provided fender washers under the mounting surface to distribute the weight load evenly.
When routing the connecting electrical wires take care to avoid sharp bends, hot components or other
hazards to the wire.
The KNIGHT
2
is not designed to be operated in a raised position while the vehicle is in motion. The
KNIGHT
2