1. Make sure that the post is located on a solid, horizontal foundation or plinth.
2. Seal the pipes to prevent dirt, moisture, or water from entering during the
mounting process.
3. Mark out the mounting points on the foundation, using the correct footprint
diagram for the model of loading post being installed.
4. Secure the loading post with 12 mm dynabolts and washers. 12 mm
dynabolts have the required strength to hold the unit but up to 16 mm
dynabolts can be used in the 19 mm footprint holes.