~23~
3 Installation
3.1 Safety Rules for Machine Movement
SETTING THE MACHINE IN PLACE
•The haulage of the machine to the installation place is done with the crane or forklift.
•Before unloading the machine, conduct a complete inspection of any damage which might have been
caused during transportation.
•Before placing the machine on the production floor, make sure that the floor base is thick and strong
enough to endure mechanical vibration and to support the weight of the machine for a long time.
•Allow enough room around the machine for auxiliary production equipment for the maintenance of the
machine.
•Use haulage equipment with sufficient strength for the machine weight. (Such as a crane, forklift, wire
ropes, and hooks)As for machine size, make sure the specifications table.
•When looping the wire ropes, put pads between the wire ropes and the machine body at the places where
the wire ropes contacts the machine body so that the machine will not get damage.
specifications table about haulage:
Variant NO. Basic
Variant Identification
Unit DB-280
Environment temperature °C +0°C~+40°C
Environment humidity % 85%
Machine size (L.W.H) mm 1250x560x470
Machine weight kg 119
Center-of-gravity position (L.W.H) mm 1250x560x470
Min. room for setting place (L.W.H) mm 1250x560x470