18
Installation
Boiler transport
1. Remove the plastic strip.
2. Open the 4 upper folders, and remove the documentation
and the condense pipe.
3. Remove the carton inserts, remove the carton box.
4. Remove the wall plate from the back of the boiler (removing one screw),
and remove the 4 screws on bottom part of the boiler.
5. Install the boiler on the cascade (with a fork lifter).
6. Install the boiler on the new wall plate (with a fork lifter).
7. Remove the water and gas plastic cap, connect the condense pipe,
and follow the installation manual.
The THISION L PLUS is a fully
equipped compact heating system,
which has been pre-set and tested at
the factory.
The package dimensions for all
appliances are:
Width 750mm
Height 1200mm
Depth 800mm
This makes it possible to transport
all models in one piece through a
normal door.
The boiler can be moved using a
fork-lift or pallet truck.Unpacking
instructions are printed on the
cardboard box. Please follow the
proposed steps.
Disassembly of panelling
The appliance casing panels can
be easily removed and this is
recommended while the appliance is
being installed. This limits the potential
for damage to occur.
Lifting and carrying precautions:
- Wear protective clothing and gloves
to protect from any sharp edges.
- The boiler has to be lifted from the
front with a forklift truck for transport.
Panelling should be attached and
secured with the supplied screw,
after assembly of the boiler, or after
maintenance works.
1
4x4x
4
2
7
5
A
B
3
A
B
C
6
A
B