Enphase IQ8P Microinverters
14 © 2024 Enphase Energy Inc. All rights reserved. January 2024
IOM-00002-1.0
NOTE: Protection against lightning and resulting voltage surges must be in
accordance with local standards.
Parts and tools required
In addition to the microinverters, PV modules, and racking, you will need the following.
Enphase equipment
• IQ Gateway: Required to monitor production and configure microinverters to be compliant
with certain AHJs. IQ Gateway models are ENV-S-AM1-230-60 and
ENV-IQ-AM3-3P.
• Enphase Installer App: Download the Enphase Installer App, open it, and log in to
your Enphase Account. Use it later to scan microinverter serial numbers and
connect to the IQ Gateway to track system installation progress. To download it, go
to https://enphase.com/installers/apps or scan the QR code at the right.
• Tie wraps or IQ Cable Clips (Q-CLIP-100)
• IQ Sealing Caps (Q-SEAL-10) for any unused drops on the IQ Cable.
• IQ Terminator (Q-TERM-10): Typically, two are needed per branch circuit.
• IQ Disconnect Tool (Q-DISC-10)
• IQ Field Wireable Connectors (male and female: Q-CONN-10M and Q-CONN-10F)
•
IQ Cable. The following table lists the cable models.
Cable model Connector spacing
Other items
• AC junction box
• Number 2 and 3 screwdrivers
• Wire cutters, voltmeter
• Torque wrench, sockets, wrenches for mounting hardware
• Power drill or impact driver