Enphase IQ8P Microinverters
18 © 2024 Enphase Energy Inc. All rights reserved. January 2024
IOM-00002-1.0
After you have created the installation map, use the Enphase Installer App (mobile app) to record
serial numbers and configure the system.
For details, refer to “Detect the Microinverters” in the help topics of the Enphase Installer App.
A. Peel the removable serial number label from each microinverter and affix it to the respective
location on the paper installation map.
B. Peel the label from the IQ Gateway and affix it to the installation map.
C. Always keep a copy of the installation map for your records.
Step 5: Manage the cabling
A. Use cable clips or tie wraps to attach the cable to the racking. Leave no more than 1.8 m (6 ft)
between cable clips or tie wraps.
B. Dress any excess cabling in loops so that it does not contact the roof. Do not form loops
smaller than 12 cm (") in diameter.
WARNING: Tripping hazard. Loose cables can become a tripping hazard. Dress the IQ Cable
to reduce this risk.
Cable clip
Affix serial number labels

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the enphase IQ8P and is the answer not in the manual?

enphase IQ8P Specifications

General IconGeneral
Brandenphase
ModelIQ8P
CategoryInverter
LanguageEnglish

Related product manuals