1
FOLLOW THE INSTALLATION SEQUENCE RELEVANT TO YOUR CABINETRY
1 SAFETY AND WARNINGS
2 COMPONENTS LIST
3 PRODUCT AND CAVITY DIMENSIONS
4 CABINETRY OPTIONS
5 STAINLESS STEEL DOOR PANEL AND TOE KICK DIMENSIONS
6 CUSTOM DOOR PANEL AND TOE KICK DIMENSIONS
7 CUSTOM DOOR PANEL INSTALLATION DIMENSIONS
8
DOOR OPENING ROTATION
9
ELECTRICAL AND PLUMBING
!0 BEFORE INSTALLATION
!1 ATTACH ANTI-TIP BRACKET
!2 ATTACH TOP TRIM – FOR 2134mm CAVITY
!3 ATTACH SIDE BRACKETS AND DOOR STUDS
!4 CONNECT TO WATER AND ELECTRICAL SUPPLY
!5 ALIGN YOUR PRODUCT INSIDE CABINETRY
!6 INSTALL WATER FILTER CARTRIDGE AND TOE KICK
!7 ASSEMBLE DOOR PANEL SET
!8 HANG ICE & WATER DOOR PANEL
!9 HANG NON-WATER DISPENSING DOOR PANELS
@0 ATTACH FIXING BRACKETS
@1 ATTACH COVERS
@2 ATTACH TOE KICK
@3 ATTACH BOTTOM TOE KICK
@6 ADJUST HINGE TENSIONING SCREWS
@7 FINAL CHECKLIST
OR
@4 ATTACH SIDE TRIM BRACKETS –
[A] FLEXIBLE SPRING CLIP METHOD
@5 ATTACH SIDE TRIM BRACKETS –
[B] FIXED SCREW METHOD
CONTENTS