Fresenius Medical Care 4008 4/09.03 (TM) 2-23
2.2 Technical measurement checks and maintenance
for options of 4008 hemodialysis systems
2.2.1 Important notes
This chapter lists all necessary technical measurement checks (TMC) and preventive mainten-
ance procedures (MA).
The checks must be performed every 24 months.
After the technical measurement checks have been performed successfully, identify the medical
equipment with a mark (label). The year of the next technical measurement checks as well as the
authority or person that performed the technical measurement checks must be indicated clearly
and traceably.
Please refer to page 2-25 for the description of the technical measurement checks and mainten-
ance.
Please refer to page 2-27 for the checklist of the technical measurement checks and mainten-
ance.