EasyManuals Logo
Home>GE>Medical Equipment>LOGIQ F5

GE LOGIQ F5 User Manual

GE LOGIQ F5
167 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #78 background imageLoading...
Page #78 background image
GE LOGIQ F SERIES
DIRECTION 5446617-100, REVISION 10 BASIC SERVICE MANUAL
4 - 2 Section 4-3 - General Procedure
Section 4-3
General Procedure
4-3-1 Power On/Boot Up
After connect the system to the electrical supply, the power is applied to the scanner. When the Control
panel Power On/Off key is pressed once, the System starts.
4-3-1-1 Scanner Power On
When power is applied to the scanner, power is distributed to the Cooling Unit, Control Panel, LCD,
Peripherals and the Back-end Processor.
4-3-1-2 Turn on the system
Press the Power On/Off switch at the front of the system once.
When the Power On/Off switch on the Control Panel is pressed once, the Back-end Processor starts
and the software code is distributed to initiate the scanner.
No status messages are displayed during this process.
CAUTION
SYSTEM REQUIRES ALL COVERS
Operate this unit only when all board covers and frame panels are securely in place. The
covers are required for safe operation, good system performance and cooling purposes.
Figure 4-1 Power On/Off Switch

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE LOGIQ F5 and is the answer not in the manual?

GE LOGIQ F5 Specifications

General IconGeneral
BrandGE
ModelLOGIQ F5
CategoryMedical Equipment
LanguageEnglish

Related product manuals