Hot Gas Path Inspection — Inspection ProceduresInspection and Maintenance — GEK 107048
HGP-I-17
Figure HGP-I.15. Shroud Tip Rework Limits.
0.35
Inch
0.35
Inch
Rework and Metal Removal Is
Allowed in the Cross Hatched Areas
Top of Center
Section
No Rework Is Permitted Which
Penetrates Below the Central Section