Set-up 4
0020239562_02 EASICOM 3 Installation and maintenance instructions 9
4.3 Checking the scope of delivery
▶ Check that the scope of delivery is complete and intact.
Quantity Description
1
Heat generator
1
Bag with accessories
– Bag with seals
– Condensate drain hose
– Drain spigot of the expansion relief valve
– Hanging bracket
– Bag containing the hydraulic connections
1 Enclosed documentation
4.4 Dimensions
Dimensions
A B C D
740 mm 130 mm 300 mm 418 mm
4.5 Minimum clearances
Minimum clearances
A B C D
≥ 150 mm ≥ 150 mm ≥ 0 mm
Note
≥ 50 mm (re-
quired clear-
ance for re-
moving the
side section)
≥ 600 mm
Note
≥ 5 mm (for
cabinet-type
casing)
4.6 Clearance from combustible components
It is not necessary to maintain a specified clearance between
the product and components made of combustible materials.
4.7 Using the mounting template
▶ Use the mounting template to ascertain the locations at
which you need to drill holes.
4.8 Wall-mounting the product
1. Check whether the wall has sufficient load-bearing ca-
pacity to bear the weight of the product under operating
conditions (operational weight).
2. Wall-mount the product as described using the adapted
fixing material provided on-site.