INITIAL OPERATION
08/2012 7
1. Selecting the site
The site must be level and horizontal.
The conditions in the SAFETY section, workplaces, must be observed.
2. Making the stripper ready for use
Attach the waste tray (protective hood) (1).
Connect the power cable (2).
Switch on the stripper at the on/off switch (3)