Shutdown and Cleaning
20 332689D
Shutdown and Cleaning
Pail Flushing
• For short term shutdown periods (overnight to two
days) refer to Short Term Storage, page 25.
• Use only water for flushing. Read Priming and
Flushing Storage Fluid, page 14 or Power Flush,
page 22.
1. Relieve pressure, page 13.
2. Remove tip and guard assembly from gun and place
in flushing fluid.
3. Place empty waste and water pails side by side.
4. Lift suction tube and prime tube from paint pail. Let
them drain into paint pail for a while.
5. Separate prime tube (smaller) from suction tube
(larger).
6. Place prime tube in waste pail.
7. Submerge suction tube in water
8. Turn pressure control knob to the Prime/Clean set-
ting.
9. Turn power switch ON.
10. Flush until approximately 1/3 of the water is emptied
from the pail.
11. Turn power switch OFF.