Installation
Connect Connect
Connect
the the
the
Electrostatic Electrostatic
Electrostatic
Controller Controller
Controller
Asmuchaspossible,cablesandtubingare
connectedatthefactory.Twoadditionalconnections
areneededfortheElectrostaticController(21).
1.Foranyinstallationthatinvolvesdiscrete
integration,connectthediscreteI/Ocable(49)
fromtheI/OcableconnectionontheElectrostatic
ControllertoaPLCorotherdevice.Two
discreteI/Ointerlockconnectionsaresupplied
andmustbesatised.SeeManual3A3657for
detailedinformationoneachpinandforinterlock
requirements.
2.Connectthepowercord(50)totheinputpower
connectionontheElectrostaticController
andsecurewiththeconnectorscrew.This
connectionisrequiredforallinstallations.The
ElectrostaticControllercanoperateat100–240
VAC(50–60Hz).Connecttheleadstoapower
sourceaccordingtolocalelectricalcodes.Pin
3ontheinputpowerconnectionisthesystem
interlock.Pin3musthavelinevoltageappliedto
satisfythesysteminterlock.SeeManual3A3657
forinformationoneachpinandforinterlock
requirements.
3.ConnectthePowerSupplyCablefromPortR
ontheapplicatortothepowerconnectoron
theElectrostaticController.Thisconnection
shouldalreadybemadeatthefactoryforPxxxxx
systems.
Connect Connect
Connect
Power Power
Power
Supply Supply
Supply
Thepowersupplyisinstalledatthefactoryonthe
bottomoftheAirController.Connectthepower
cord(35)tothepowersupplyconnector(16).The
suppliedpowercordhasaNEMA5–15Pplugto
connecttoACpower.
3A4232D13