EasyManuals Logo
Home>Gree>Heat Pump>Versati II Series

Gree Versati II Series User Manual

Gree Versati II Series
97 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #50 background imageLoading...
Page #50 background image
47
Air to Water Heat Pump
Service Manual- Versati II Series
INSTALLATION
2 ELECTRIC WIRING WORK
2�1 Wiring Principle
(1) General principles
Wires, equipment and connectors supplied for use on the site must be in compliance with provisions of
regulations and engineering requirements.
Only electricians holding qualication are allowed to perform wire connection on the site.
Before connection work is started, the power supply must be shut off.
Installer shall be responsible for any damage due to incorrect connection of the external circuit of the unit.
Caution --- MUST use copper wires.
(2) Connection of power cable to the electric cabinet of the unit
Power cables should be laid out through cabling trough, conduit tube or cable channel.
Power cables to be connected into the electric cabinet must be protected with rubber or plastic to prevent
scratch by edge of metal plate.
Power cables close to the electric cabinet of the unit must be xed reliably to make the power terminal in
the cabinet free from an external force.
Power cable must be grounded reliably.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Gree Versati II Series and is the answer not in the manual?

Gree Versati II Series Specifications

General IconGeneral
BrandGree
ModelVersati II Series
CategoryHeat Pump
LanguageEnglish

Related product manuals