2�1 Wiring Principle
(1) General principles
Wires, equipment and connectors supplied for use on the site must be in compliance with provisions of
regulations and engineering requirements.
●
Only electricians holding qualication are allowed to perform wire connection on the site.
●
Before connection work is started, the power supply must be shut off.
●
Installer shall be responsible for any damage due to incorrect connection of the external circuit of the unit.
●
Caution --- MUST use copper wires.
(2) Connection of power cable to the electric cabinet of the unit
●
Power cables should be laid out through cabling trough, conduit tube or cable channel.
●
Power cables to be connected into the electric cabinet must be protected with rubber or plastic to prevent
scratch by edge of metal plate.
●
Power cables close to the electric cabinet of the unit must be xed reliably to make the power terminal in
the cabinet free from an external force.
●