16/24-Port 100M Long-Range PoE Switch Quick Start Guide
7
Figure 2-2 Fix Switch to Rack
Do not place any heavy object on the switch in case of any incident.
Make sure sound cooling and ventilation.
2.4 Grounding
Purpose:
Grounding is used to quickly release overvoltage and overcurrent induced by lightening for switch,
and to protect personal safety. Select the appropriate grounding method according to your needs.
2.4.1 With Grounding Bar
If a grounding bar is available at the installation site, follow the steps below.
Step 1 Connect one end of the grounding cable to the binding post on the grounding bar.
Step 2 Connect the other end of the grounding cable to the switch grounding terminal and fix the
screw.

Other manuals for HIKVISION DS-3E2300P Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the HIKVISION DS-3E2300P Series and is the answer not in the manual?

HIKVISION DS-3E2300P Series Specifications

General IconGeneral
BrandHIKVISION
ModelDS-3E2300P Series
CategorySwitch
LanguageEnglish

Related product manuals