HyPrecision Predictive waterjet pump Operator Manual 810120 201
9 – Installation
Installation
4. Put the cord grip connector on the cord.
5. Put the cord and the threaded end of the cord grip connector through the hole.
6. Put the lock nut on the cord grip connector.
7. Connect the motor wires (L1, L2, and L3) to the motor starter. Connect the ground wire to the grounding lug
(PE).
8. Tighten the gland nut on the cord.
9. The heat exchanger includes 2 hydraulic hoses. Connect the hoses to the utility panel. Refer to Make the
connections to the utility panel on page 205.