HyPrecision Predictive waterjet pump Operator Manual 810120 203
9 – Installation
Installation
5. Put the lock nut on the cord grip connector.
6. Connect the motor wires (L1, L2, and L3) to the motor starter. Connect the ground wire to the grounding lug
(PE).
7. Tighten the gland nut on the cord.
8. Connect the supply water to the fitting on the boost pump that is marked INLET.
9. The boost pump includes 1 water hose. Connect 1 end of the hose to the fitting marked OUTLET on the
boost pump.
10. Connect the other end of the hose to the C
UTTING WATER IN fitting on the pump’s utility panel. Refer to Make
the connections to the utility panel on page 205.