For the full range of
FLUE AND ACCESSORIES
please visit idealheating.com/
ues
SCAN
for Flues and
Accessories Guide
A video showing how to correctly
measure and t a ue can be
found by viewing the QR Code.
SCAN
for Flue Fitting
Video’s
2.14 ASSEMBLING THE VERTICAL FLUE
Extension
Duct
Vertical
connector
Determine the correct height that the ue should terminate above the
roof. If after calculating or measuring the overall ue height from the top
of the boiler, it is necessary to cut both pipes of assembly A, then ensure
they are cut equally leaving the inner ue tube longer than the outer air
tube as supplied.
Ensure the cut pipe ends are free from any burrs.
1. Position the roof ashing plate (supplied separately) over the hole
cut in the roof and insert ue terminal from the roof end.
2. Fit the vertical connector (supplied in kit) in accordance with the
instructions provided.
3. Secure the vertical connector by applying downward pressure on the
connector.
4. Position the clamp on the top face of the ue manifold and push
it horizontally backwards. Locate both clamp lugs into the ue
manifold and secure to the ue manifold with the M5 retaining screw.
nm8739
min 25
o
max 45
o
MAX LENGTH:
7.5m
BOILER
Flue Terminal
weather collar
pitched roof
weather collar
flat roof
'X'
5. Push extension duct (if required (supplied separately)) into vertical
connector.
Note. Ensure turret sample points are servicable and all caps and plugs
are tted. Fill the condense trap/siphon with water.
6. If the last extension duct requires cutting, measure ‘X’, the distance
(outer ducts), between the duct and the terminal and add 100 mm to
this dimension. This gives the length of the last extension duct.
Note. Check the position of the inner ue duct
relative to the outer duct on the assembled
extension duct(s) and ensure the terminal ue
duct is cut longer than the air duct to ensure
engagement in the nal ue duct seal.
7. Finally ensure the roof ashing plate is
correctly sealed to the roof.
1
5
4
2
6

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the IDEAL LOGIC+ SYSTEM2 S15 and is the answer not in the manual?

IDEAL LOGIC+ SYSTEM2 S15 Specifications

General IconGeneral
BrandIDEAL
ModelLOGIC+ SYSTEM2 S15
CategoryBoiler
LanguageEnglish

Related product manuals