Operation
Preparing the Machine for Travel
113 113
9811/9950-1
Preparing the Machine for Travel
Introduction
When you travel on the road or on site there are usually
local rules and safety regulations for the machine travel
position. The Preparing for Site Travel described on the
following pages are recommendations that should help
you meet the requirements of these regulations; they are
not necessarily the applied law.
Please make sure that before you travel on site, you and
your machine comply with all the relevant local laws - it is
your responsibility.
Preparing for Site Travel
P11-2029_2
1 Activate warning beacon if fitted.
2 Cab facing forward over dozer, dozer blade fully up.
3 Position the excavator:
Level Site Conditions: Position boom fully up, operate
dipper fully in and bucket fully crowded, i.e. bucket
rotated fully towards cab.
Uneven Site Conditions: Lower the boom so that the
bucket or attachment is approximately 150 mm (6 in.)
from the ground. K
Fig 54. ( T 114)