EasyManuals Logo
Home>JUKI>Industrial Equipment>KE-2000 Series

JUKI KE-2000 Series User Manual

JUKI KE-2000 Series
52 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #14 background imageLoading...
Page #14 background image
KE2000 Installation Manual
10
4. Adjusting the transport height and leveling the machine
4-1. KE-2010/2020/2040
<Procedure>
1. Detach the cover FB, cover RBC, cover RBR, and cover RBL (Fig 4-1-1).
Detach the air cap put at the end of the rail (Fig 4-1-2,Fig 4-1-3).
For only the model KE-2030, the rail is separated into four pieces, IN buffer, IN center
station, OUT center station, and OUT buffer.
Fig 4-1-1
Fig 4-1-2
Fig 4-1-3
Cover FB
Cover RBR
Cover RBC
Cover RBL

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the JUKI KE-2000 Series and is the answer not in the manual?

JUKI KE-2000 Series Specifications

General IconGeneral
BrandJUKI
ModelKE-2000 Series
CategoryIndustrial Equipment
LanguageEnglish

Related product manuals