KE2000 Installation Manual
43
15. Checking the machine before turning on the power
<Procedure>
1. Check that the mounter main unit is leveled correctly.
2. Check that the height of the transport rail satisfies the customer's requirements.
3. Check that the adjuster lock nuts are secured firmly.
4. Check that the dry air is supplied to the machine correctly.
5. Check that the power cord is connected to the mounter main unit correctly. (Check
also that the voltage level is proper.)
6. Check that all the transportation fixing fittings are removed completely from the
Z-axis, head, ATC, transport rail, and other machine units.
7. Check that all the accessories are set on the machine correctly.
8. Check that the machine is connected to the external equipment correctly.
9. Check that the axis of each unit moves smoothly with manual operation.
- Hold both ends of the X-axis by hands and move it back and forth to check that
it moves smoothly.
- Hold the head plate by hand and move it horizontally to check that it moves
smoothly.
- Check that the Z-axis and (-axis of the head move smoothly by finger.
WARNING
WARNINGWARNING
WARNING
To prevent the body from injury which can be caused by
accidental activation of the machine , cut off the power to
the machine before starting to work.
WARNING
WARNINGWARNING
WARNING
Never connect different voltage specifications.
CAUTION
CAUTIONCAUTION
CAUTION
Check to make sure that a sufficient current-carrying
capacity for power supply is secured in the factory.