6
-
5
6
-
4
3-POINT HITCH IMPLEMENT OPERATIONNX4510/NX5010/NX5510/NX6010
6
6
-
5
6
-
4
3-POINT HITCH IMPLEMENT OPERATIONNX4510/NX5010/NX5510/NX6010
OPERATION TIP FOR 3-POINT HITCH ELEMENTS
(1) Top Link
(2) Crank Lifting Rod
(3) Lifting Rod
(4) Telescopic Stabilizers
(5) Lower Link
(6) Draft Hitch
Te1O620A
ADJUSTMENT OF LIFT ROD
(1) Lift Rod
(3) Stopper
(2) Adjuster Handle
1. Adjust the implement level bal-
anced by turning the lift rod han-
dle.
2. After adjustment, fix it with the
stopper.
Te1O614A
TE120(NX4510,5010,5510)CABIN,ROP5 5 2014-03-27 오후 3:22:24