Refilling/Bleeding the cooling system
– Pour approx. 0.5 litres coolant into the system.
– Remove the bolt
1 on the right radiator.
– Now add cooling liquid until it emerges free of bubbles at the right
radiator. Then immediately mount the bolt so that no more air can
enter the right radiator.
–Top up the left radiator until the coolant can be seen approx. 10 mm
above the radiator fins.
Total capacity: 1 l
– After installing briefly warm up the engine and top up the cooling
liquid. If the engine is working properly a short, careful test ride can
be taken.
– After the test ride check the engine and the exhaust system for leaks.
Adjusting the throttle cable
There must always be a 3-5 mm) play in the throttle cable.
–To check this, move back the protective cover
2 on the throttle grip.
You must be able to lift the outer covering of the cable 3-5 mm from
the adjusting screw
3 until resistance is felt.
–To adjust, loosen the counternut
4 and turn the adjusting screw
accordingly. Finally tighten the counternut and slide the protective
cover back on.
–To check the correctness of this setting, start the engine, turn the
handlebar left and right, in both cases as far as it will go. This must
not cause any changes in idling speed. Otherwise, you will have to
increase the backlash of the throttle cable.