Installation Guide
Softswitch128TM (XPS) and
GRAFIK SystemsTM (XP)
Switching Panels
Please Read
Contents
PPaanneell MMooddeell NNuummbbeerr GGuuiiddee
Softswitch128 (XPS) 2
GRAFIK Systems (XP) 3
PPaanneell DDiimmeennssiioonnss
Mini Panel 4
Standard Panel 5
Large Panel 6
Extra-Large Panel 7
PPaanneell MMoouunnttiinngg
Panel and TUB Mounting 8
Rough-In Panel Interior Mounting 9
WWiirriinngg
Feed-Through Panel: Feed and Load Wiring 10
Dual-Voltage Panel: Feed and Load Wiring 10
Panel with Branch Circuit Breakers:
Feed and Load Wiring 11
Panel with Isolation Switch:
Feed and Load Wiring 12
System Wiring Overview 13
RRaattiinnggss
Softswitch128 (XPS) 14
GRAFIK Systems (XP) 15
Temporary Lighting 16
Activate Loads in Bypass 16
Complete Installation 17
Remove Bypass Jumpers 17
Warranty 19
Contact Information 20
Overview
Use this guide to successfully install a switching panel. This guide describes panel installation, wiring, and load
activation. For systems using rough-in panels, special instructions are included for keepout areas, panel
mounting, and installing the panel interior.
XPS48-1204ML-20 shown
CChhiinneessee
EEnngglliisshh
EEssppaaññooll FFrraannççaaiiss
PPoorrttuugguuêêss
NNeeddeerrllaannddss
DDeeuuttsscchh
IIttaalliiaannoo