10.4 Recommissioning of decommissioned engines
10.4.1 Commissioning of preserved engines to MAN Works Standard M 3069
1. Remove external preservation. Never use a high pressure cleaner for this.
2. Remove caps from intake and exhaust openings.
3. Check cooling system; add antifreeze according to the Fuels, Lubricants and Coolants list (see “Fuels,
Lubricants and Coolants..."); check concentration and correct.
4. Check engine oil level and add fresh approved engine oil if necessary.
5. Check the operation of the monitoring and emergency shut off equipment.
6. Check condition and proper installation of elastic fasteners, such as V-belts, coolant hoses and charge
air hoses. Retighten if necessary.
7. With the gas supply shut off, crank the engine with the starter until the oil is pressurised. Do not actuate
the starter for any more than 12 seconds.
8. Open gas supply and start engine. After engine is running, operate engine above idle speed to avoid
insufficient lubrication of the cylinder liners.
9. Check engine for leaks, unusual noises and observe the oil pressure and all temperatures. Increase en
gine speed in steps.
10.After a max. of 25 operating hours, drain preservation oil from engine and change oil filter; fill engine
with fresh approve engine oil.
10.4.2 Commissioning of non-preserved engines
In addition to the work steps for a preserved engine, the commissioning of a non-preserved engine requires
the following extra work depending on the possible non-use damages.
1. Check combustion chambers with an endoscope, to do this, remove/install spark plugs.
Check valve for easy movement; check valve clearance and adjust if necessary.
Replace any damaged/corroded parts.
2. Drain old oil from engine and change oil filter. Fill engine with fresh approved engine oil.
3. Check cooling system for corrosion; check coolant for proper concentration; if in doubt, change coolant.
Before adding new coolant , clean coolant chambers and remove/install coolant pump and thermostat if
necessary; replace the slide ring seal of the coolant pump and thermostat elements; pressure test coo
ling system.
4. Check clean air system, air filter and turbocharger for dirt and corrosion. Clean or repair if necessary.
5. Clean/check/replace gas filter.