EasyManuals Logo
Home>Manitowoc>Construction Equipment>31000

Manitowoc 31000 User Manual

Manitowoc 31000
126 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #90 background imageLoading...
Page #90 background image
Reference Only
SET-UP AND INSTALLATION 31000 LUFFING JIB OPERATOR MANUAL
4-66 Published 07-23-15, Control # 078-03
2
Information below from drawing A19443, Sheet 29:
Attach the strap rigging winch (G) as shown in Figure 4-24
.
Remove the short strap pin (A) from the boom strap without the link assembly (B).
Store the short strap pin (A). Keep the collar (D), pin (E), and cotter pin (F).
3
Information below from drawing A19443, Sheet 29:
Rotate the link assembly (A) into its normal position as shown below.
Connect the link assembly (A) to the boom strap (H) using the long boom strap pin (B).
Replace the remaining short boom strap pin (C) with a long boom strap pin (B).
Place the intermediate suspension link (D) over both long boom strap pins (B).
Add collar (E), pin (F), and cotter pin (G) from the previous step (Figure 4-70
).
Repeat for the other link assembly.
Step Action
FIGURE 4-70
Item Description
A Short strap pin.
B Strap without link assembly.
C Strap with link assembly.
D Collar.
E Pin.
F Cotter pin.
G Strap rigging winch.
A
B
C
D
E and F
G
FIGURE 4-71
Item Description
A Link assembly.
B Long boom strap pin.
C Short boom strap pin.
D Intermediate suspension top link.
E Collar.
F Pin.
G Cotter pin.
A
E, F, G
D

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc 31000 and is the answer not in the manual?

Manitowoc 31000 Specifications

General IconGeneral
BrandManitowoc
Model31000
CategoryConstruction Equipment
LanguageEnglish

Related product manuals