3
Product Overview
2.4KW/3KW/4KW 5KW
NOTE: For parallel model installation and operation, please check separate parallel installation guide for
the details.
1. LCD display 9. PV connectors
2. Status indicator 10. Battery connectors
3. Charging indicator 11. Circuit breaker
4. Fault indicator 12. Parallel communication cable
5. Function buttons 13. Current sharing cable
6. Power on/off switch 14. Dry contact
7. Grid connectors 15. RS-232 communication port
8. AC output connectors (Load connection) 16. USB communication port