EasyManuals Logo
Home>Midea>Air Conditioner>MISSION2 3D INVERTER Series

Midea MISSION2 3D INVERTER Series User Manual

Midea MISSION2 3D INVERTER Series
113 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #100 background imageLoading...
Page #100 background image
Troubleshooting
Page 96
5.10 P1(Over voltage or too low voltage protection diagnosis and solution)
Description: Abnormal increases or decreases in voltage are detected by checking the specified voltage detection circuit.
Recommended parts to prepare:
Power supply issues
System leakage or blockage
Faulty PCB
Troubleshooting and repair:
Check the power supply
.
Is it in working order?
Turn off the unit.
NO
Check the connections and wires.
YES
Are they in working order?
Ensure proper connections or
replace the wires.
NO
Power on and measure the
voltage between P and N.
YES
While the unit is in standby,
is the voltage between P and N is around
DC 310V, 340V or 380V? When start up
the unit, is it in 220V~400V?
Replace the IPM board.
NO
Check the reactor.
YES
Is it in working order?
Replace outdoor PCB.NO
Replace the reactor.
YES

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Midea MISSION2 3D INVERTER Series and is the answer not in the manual?

Midea MISSION2 3D INVERTER Series Specifications

General IconGeneral
BrandMidea
ModelMISSION2 3D INVERTER Series
CategoryAir Conditioner
LanguageEnglish

Related product manuals