Maintenance and
Disassembly
Page 25
1.3 Re-Installation
1.3.1 Indoor Unit
Collecting the refrigerant into the outdoor unit
/TJUUX[TOZ
2OW[OJYOJK
-GYYOJK
)RUYK
)RUYK
:]U]G_\GR\K
:NXKK]G_\GR\K
5[ZJUUX[TOZ
5VKT
)RUYK
2U
.O
Procedure:
1. Confirm that the 2- and 3-way valves are opened.
2. Connect the charge hose with the push pin of Handle
Lo to the 3-way valve’s gas service port.
3. Open the Handle Lo manifold valve to purge air
from the charge hose for 5 seconds and then close it
quickly.
4. Close the 2-way valve.
5. Operate the air conditioner in cooling mode. Cease
operations when the gauge reaches 0.1 MPa
(14.5 Psi).
6. Close the 3-way valve so that the gauge rests
between 0.3 MPa (43.5 Psi) and 0.5 MPa (72.5 Psi).
7. Disconnect the charge set and mount the caps of
service port and 2- and 3-way valves.
8. Use a torque wrench to tighten the caps to a torque
of 18N.m.
9. Check for gas leakage.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Midea MISSION2 3D INVERTER Series and is the answer not in the manual?

Midea MISSION2 3D INVERTER Series Specifications

General IconGeneral
BrandMidea
ModelMISSION2 3D INVERTER Series
CategoryAir Conditioner
LanguageEnglish

Related product manuals