Method for connecting the accessory pipe
Be sure to use the accessory pipe to connect the operation valve on the
gas side with the field pipe.
Table 1 Parts used for the connecting pipe assembly
Table 2 Length and specification of straight pipe (Procured in the field)
1
ReferringîtoîTableî
1
andîTableî
2
,îprepareîtheîstraightîpipeîandîtheîelbowîinîtheîďŹeld,îwhichîareî
usedîinîtheîconstructionîexamplesîA-Dîapplicableîtoîtheîconnectingîdirection.
2
Firstly,îuseîtheîaccessoryîpipeîtoîassembleîtheîconnectingîpipeîassemblyîoutsideîtheîoutdoorîunit.
AsîshownîinîtheîďŹguresîofîconstructionîexamplesî
A
ă
D
applicableîtoîtheîconnectingîdirectionî
(chainîdoubleîdashedîline),îbrazeîtheîaccessoryîpipeîandîtheîpartsîpreparedîinîtheîaboveî 1 .
âOrientîtheîaccessoryîpipeîaccordingîtoîtheîdimensionsîasîshownîinî îofîFig.î1.
3
Afterîassemblyîofîtheîconnectingîpipe,îconnectîitîtoîtheîoperationîvalveîonîtheîgasîsideîinsideîtheî
outdoorîunit.
TightenîtheîďŹareînutîwithîappropriateîtorque.
4
Afterîconnectionîofîtheîconnectingîpipeîassemblyîtoîtheîoperationîvalveîonîtheîgasîside,îbrazeîtheî
connectingîpipeîassemblyîandîtheîďŹeldîpipe.
5 Afterîtheîbrazing,îinsulateîusingîtheîattachedîheatîinsulatingîmaterialîandîbandîasîshownîbyîFig.î2.
Ifînoînitrogenîgasîisîsupplled,îaîlargeîamountîofîimpurityî(oxidizedîďŹlm)îwillîbeîgenerated,î
whichîmayîclogîtheîcapillaryîtubeîandîtheîexpansionîvalve,îresultingîinîfatalîmalfunction.
Beîsureîtoîuseîpipesîofî1/2Hîmaterial,îandîwallîthicknessîaboveî1mm.î(PressureîresistanceîofîO-typeî
pipeîisînotîenough)
Selectîandîuseîtheîpipes,îwhichîareîprocuredîinîtheîďŹeld,î
accordingîtoîtheîspeciďŹcationîthatîcorrespondsîtoîtheî
outdoorîunitîcapacityîasîdescribedîinîtheîinstallationîmanual.
Be sure to braze while supplying nitrogen gas.
About brazing
Name
Accessoryîpipe
îHeatîinsulatingîmaterial
îBand
îStraightîpipeî
1
îStraightîpipeî
2
îElbow
A
Downward
B
Forward
C
Rightward
D
Backward
No.
1
2
3
4
5
6
Quantity
1
1
2
1
1 or 0
1 or 0
Remark
Accessory
Accessory
Accessory
ProcuredîatîtheîďŹeld
ProcuredîatîtheîďŹeldî(Notîrequiredîforîdownwardîdirection)
ProcuredîatîtheîďŹeldî(Notîrequiredîforîdownwardîdirection)
Straight pipe
1
Straight pipe
2
Straightîpipeî
1
Straightîpipeî
2
270îmmîorîover
â
70ă120mm
125mmîorîover
70ă120mm
125mmîorîover
70ă120mm
515mmîorîover
224
280
ø19.05-ø25.4
ø22.22-ø28.58
PSB012D917G
k
ø19.05 100~120N¡m
Accessoryîpipe
Accessoryîpipe
Accessoryîpipe
Accessoryîpipe
Internalîfaceîofîbase
Operationîvalveîconnectingî
positionîatîgasîside
Band
Proper torque
(Accessory)
(Accessory)
Pipe specification
Heatîinsulatingîmaterial
Internalîfaceîofîbase
(ProcuredîinîtheîďŹeld,î
125îmmîorîmore)
Straightîpipeî
2
(ProcuredîinîtheîďŹeld,î
125îmmîorîmore)
Straightîpipeî
2
(ProcuredîinîtheîďŹeld,î
515îmmîorîmore)
Elbow,
procuredîinîtheîďŹeld
Elbow,
procuredîinîtheîďŹeld
Elbow,
procuredîinîtheîďŹeld
Brazeîtheîrefrigerantîpipeîhere.
Brazeîtheîrefrigerantîpipeîhere.
Brazeîtheîrefrigerantî
pipeîhere.
Brazeîtheîrefrigerantî
pipeîhere.
Connection example of refrigerant pipe -
B
(Forward connection)
Connection example of refrigerant pipe -
D
(Backward connection)
Connection example of refrigerant pipe -
C
(Rightward connection)
Connectionîexampleîofîrefrigerantîpipeî-î
A
(Downwardîconnection)
Heat insulating method
(Fig. 2)
Accessoryîpipeîxî1îpc
Heatîinsulatingî
materialîxî1îpc
Bandîxî2îpcs
Heatîinsulatingîmaterialîisîattachedîtoîtheîaccessoryîpipeîwithî
band.îWhenîinstallingîtheîheatîinsulatingîmaterial,îcutîtheîbandî
andîretrieveîit.
TwoîpiecesîofîďŹg.î2îbandîforîinstallationîareîfoundîinîaîbag.
40
67
(ProcuredîinîtheîďŹeld,î
70î-î120îmm)
Straightîpipeî
1
(ProcuredîinîtheîďŹeld,î
70î-î120îmm)
Straightîpipeî
1
(ProcuredîinîtheîďŹeld,î
70î-î120îmm)
Straightîpipeî
1
(ProcuredîinîtheîďŹeld,î
270îmmîorîmore)
Accessory pipe position
(Fig. 1)