2.36
9926814 R08 - 2015-2016 RZR 900 2016 RZR S 1000 Service
Manual
© Copyright Polaris Industries Inc.
STATE OF
CHARGE
VOLTAGE
(DC)
ACTION
CHARG-
E TIME
25% - 50% 12.0 - 12.3
Needs
Charge
At least
13 hrs
0% - 25% 12.0 or less
Needs
Charge
At least
20 hrs
NOTE
Follow the charger instructions supplied by the
manufacture regarding the order or connections, switch
positions and when to connect the charger to an outlet.
ENGINE / CHASSIS GROUND
Inspect the ground cable connections. Remove ground
terminals and clean if necessary.
The chassis ground connection
w
, located below the
start solenoid
q
, can be accessed through the left rear
wheel area.
Inspect the chassis ground terminals. Be sure the
grounds are clean and tight.
SPARK PLUG SERVICE
Inspect and replace the spark plugs at the intervals
outlined in the Periodic Maintenance Chart.
1. Remove the cargo box access panel
q
.
WARNING
A hot engine can cause serious burns. Allow engine to
cool or wear protective gloves when removing the spark
plugs.
2. Remove both spark plug caps
w
.
NOTE
Use MAG and PTO reference decals on spark plug
wires for reassembly.
3. Clean out plug wells with compressed air to remove
any loose dirt or debris.
4. Rinse plug wells with water and dry with compressed
air.
NOTE
Spark plug wells have drain holes built into the cylinder
head to allow water to drain out.
MAINTENANCE