cobas c 111 Installation Manual
04906900001
INSTALLATION-MANUAL cobas c 111
Version 3.0 Page 17 of 43
cobas c111 instrument connector
ISE Unit Power Supply Connector
5.3 Unpacking
Important: Do not allow unqualified personnel to unpack, set up, or perform first time
operation of the cobas c 111. Unauthorized action taken by the customer in this regard
could void the warranty on the analyzer.
The original shipping containers must be transferred unopened to the installation site.
Unpack the instrument and check that all items mentioned on the packing list are
present. If the package is damaged or parts are missing please report immediately to
your local Roche Diagnostics representative and file a report with the shipping agent.
5.3.1 Unpacking procedure for instrument with ISE:
1. Open the box at the top. (On the upper cardboard cover inside the box you
can find the standard accessories of the system).
Bottle rack
Accessoires