R5 Series
To make sure the installation spot is suitably ventilated, if multiple SAJ on-grid olar
inverters are installed in the same area, the following safety clearance in Figure 4.2
shall be followed for proper ventilation conditions.
4.2 Installation position
4.4 Mounting Procedure
4.4.1 Mark the Positions of the Drill Holes of the Rear Panel
The mounting position should be marked as shown in Figure 4.3,Figure 4.4,Figure
4.5.
Figure 4.3 Dimensions of rear panel of R5-0.7K/1K/1.5K/2K/2.5K/3K-S1