SINUMERIK 802C base line
4-1
Start-Up
Start-Up
4
4.1 General
Start–up requirements
z
The following is required:
User Manual: Operation and Programming, SINUMERIK 802C base
line
PC/PG (programming device) only for data saving and series start–
up
Toolbox on CD. The CD is either supplied with the control system or
can be ordered separately.
Contents
WINPCIN for data transfer via the V24 interface from/to
external PC/PG
Cycle pack Turning and Milling
z
The mechanical and electrical installation of the equipment must be
completed.
Notice
For installation refer to the installation notes provided in the section 2.
z
The control system with its components has powered up without errors.
Start–up
sequence
The SINUMERIK 802C base line can be strated up as follows:
1. Check whether the ENC has powered up.
2. PLC start-up
3. Technology setting
4. Set general machine data.
5. Set axis/machine–specific machine data.
Match encoder with spindle
Match setpoint with spindle
6. Dry run for axes and spindle(s)
7. Drive optimization
8. Complete start-up, data saving