HMC6 Power Management Controller User Manual Page 50 of 87
Stop delay caused by human triggered
(e.g. manual transfer priority, high
consumer request and etc.)
High speed cooling time before stop
output.
After busbar retardant power meet with
high consumer request, high consumer
ACK output after this delay.
After busbar retardant power meet with
high consumer request, high consumer
ACK output after “HC Stable Delay”.
11.3 GENERATOR SETTING
Table 21 – Generator Parameter Settings
0: 3 phase, 4 wire (3P4W);
1: 3 phase, 3 wire (3P3W);
2: 2 phase, 3 wire (2P3W);
3: 1 phase, 2 wire (1P2W).
To offer standards for detecting of
generator’s over/under voltage. (It is
primary voltage when using voltage
transformer; it is line voltage when AC
system is 3P3W while it is phase
voltage when using other AC system).
Setting value is percentage of
generator rated voltage. Detect when
controller prepare loading. When
generator voltage under load voltage,
won’t enter into normally running.
To offer standards for detecting crank
disconnect voltage is satisfied or not.
To offer standards for detecting of
over/under/load frequency.
Setting value is percentage of
generator rated frequency. Detect
when controller prepare loading. When
generator frequency under load
frequency, it won’t enter into normal
running.
To offer standards for detecting crank