13. Slide the large black O-ring and the two smaller black
O-rings into the grooves on the driveshaft.
Thoroughly lubricate the O-rings and shaft. (
See
Figure 6-25.) Do not lubricate the hex end of the
shaft.
Figure 6-25
14. Install the hex end of the driveshaft into the drive hub
at the rear wall of the mix hopper. (
See Figure 6-26.)
Figure 6-26
Note: For ease in installing the pump, position the
ball crank of the driveshaft in the 3 o’clock position.
Sanitizing
1. Prepare an approved 100 PPM sanitizing solution
(examples: 2-1/2 gal. [9.5 L] of Kay-5
®
or 2 gal.
[7.6 L] of Stera-Sheen
®
). Use warm water and follow
the manufacturer’s instructions.
2. Pour the sanitizing solution over all the parts in the
bottom of the mix hopper and allow it to flow into the
freezing cylinder.
Figure 6-27
Note: You have just sanitized the mix hopper and
parts; therefore, make sure your hands are clean and
sanitized before going on in these instructions.
3. While the solution is flowing into the freezing cylinder,
take particular care to brush-clean the mix level
sensing probe on the front wall and the bottom of the
hopper, the mix hopper, the mix inlet hole, the air/mix
pump, the pump clip, the mix feed tube, and the
locking clip.
15009
12012
12029

Other manuals for Taylor C706

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Taylor C706 and is the answer not in the manual?

Taylor C706 Specifications

General IconGeneral
BrandTaylor
ModelC706
CategoryFreezer
LanguageEnglish

Related product manuals