Step 13
Slide the large black o--ring and the two smaller black
o--rings into the grooves on the drive shaft. Thoroughly
lubricate the o--rings and shaft. DO NOT lubricate the
hex end of the shaft. (See Figure 29.)
Figure 29
Step 14
Install the hex end of the drive shaft into the drive hub
at the rear wall of the mix hopper. (See Figure 30.)
Figure 30
Note: For ease in installing the pump, position the ball
crank of the drive shaft in the 3 o’clock position.
Sanitizing
Step 1
Prepare an approved 100 PPM sanitizing solution
(examples: 2--1/2 gal. [9.5 liters] of Kay--5R or 2
gal. [7.6 liters] of Stera--SheenR). USE WARM WA-
TER AND FOLLOW THE MANUFACTURER’S
SPECIFICATIONS.
Step 2
Pour the sanitizing solution over all the parts in the
bottom of the mix hopper and allow it to flow into the
freezing cylinder.
Figure 31
Note: You have just sanitized the mix hopper and
parts; therefore, be sure your hands are clean and
sanitized before going on in these instructions.
Step 3
While the solution is flowing into the freezing cylinder,
take particular care to brush--clean the mix level
sensing probe on the front wall and the bottom of the
hopper, the mix hopper, the mix inlet hole, the air/mix
pump, the pump clip, the mix feed tube, and the locking
clip.

Other manuals for Taylor C706

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Taylor C706 and is the answer not in the manual?

Taylor C706 Specifications

General IconGeneral
BrandTaylor
ModelC706
CategoryFreezer
LanguageEnglish

Related product manuals