Creation:03.09 — 2009 1-2-1
Operation
Operation
1. Preparation for Use
A. Inspection/Check
Inspect the unit thoroughly prior to operation.
(1) Remove the blocking, banding, ties, and other securing material.
(2) Inspect for shipping damage.
(3) Inspect the interior for foreign material such as rags, shipping papers, etc.
(4) Check the fuel, coolant and oil hoses and connections for visible leaks.
(5) Check the following for sufficient quantity.
(a) Fuel
The level gauge should be at or near full.
(b) Engine coolant
Coolant level should be approximately one inch below the radiator filler neck.
The expansion tank should be approximately half full.
(c) Engine Lubricating Oil
The oil level should be at the full mark on the dipstick. See the “Cummins Engine”
manual for oil recommendations.
WARNING:
IMPROPER OPERATION CAN KILL! READ AND UNDERSTAND
ALL OF THE OPERATING INSTRUCTIONS BEFORE
ATTEMPTING TO OPERATE THE UNIT.
CAUTION:
BE SURE THE COOLANT SYSTEM ANTI-FREEZE SOLUTION IS
ADEQUATE TO PROTECT BELOW THE LOWEST
TEMPERATURE EXPECTED.
NOTE:
For antifreeze protection use a solution of 50% permanent
antifreeze (ethylene glycol) and 50% clean water.