RemovingtheFrontCover
1.Raisetheloaderarmsandsecurethemwiththe
cylinderlocks.
2.Loosenthe2boltssecuringthefrontcoverto
themachine(Figure43).
g260062
Figure43
1.Frontcover
2.Bolt(2)
3.Slidethecoveroffthemachine.
4.Wheninstallingthecover,torquetheboltsto41
N∙m(30ft-lb).
RemovingtheFrontCover
Assembly
1.Raisetheloaderarmsandsecurethemwiththe
cylinderlocks.
2.Removethe4boltssecuringthecoverassembly
tothemachine(Figure44).
g303492
Figure44
1.Bolt(4)
2.Frontcoverassembly.
3.Removethecoverassembly(Figure44).
Lubrication
LubricatingtheMachine
ServiceInterval:Beforeeachuseordaily(Grease
immediatelyaftereverywashing.)
GreaseType:General-purposegrease.
1.Parkthemachineonalevelsurface,engagethe
parkingbrake,andlowertheloaderarms.
2.Shutofftheengineandremovethekey.
3.Cleanthegreasettingswitharag.
4.Connectagreaseguntoeachtting(Figure45,
Figure46,andFigure47).
Note:Raisetheloaderarmsbeforegreasing
thettingsinFigure47.
g261040
Figure45
g261039
Figure46
32