Ascend™ Model ACR Series C
Installation Completion Check
Sheet and Request for Trane
Service
Important: A copy of this completed form must be
submitted to the Trane service agency that will
be responsible for the start-up of the chiller.
Start-up will NOT proceed unless applicable
items listed in this form have been
satisfactorily completed.
To:
Trane Service Office:
S.O. Number:
Serial Numbers:
Job/Project Name:
Address:
The following items
are being installed
and will be completed by:
Important: Start-up must be performed by Trane or an
agent of Trane specifically authorized to
perform start-up and warranty of Trane®
products. Contractor shall provide Trane (or an
agent of Trane specifically authorized to
perform start-up) with notice of the scheduled
start-up at least two weeks prior to the
scheduled start-up.
Important: Chiller heaters must be energized a
minimum of 24 hours prior to start-up.
Chiller should have power applied for this
amount of time before Trane Service
arrives for start-up.
Check boxes if the task is complete or if the answer is
“yes”.
1. Chiller
Installation meets foundation requirements.
In place and piped.
Isolation pads or elastomeric pads installed
(optional).
For units with InvisiSound™ Ultimate Option (model
number digit 13 = E), compressor mounting bolts
have been removed.
2. Refrigerant Pressure Check
PRIOR to water being pumped into system, use
gauges to verify positive pressure in the evaporator
and condenser. Lack of pressure could indicate a
system leak. When charging in the factory,
approximately 95% of the refrigerant charge is
isolated in the evaporator, and the other 5% is
contained in the condenser and compressor. If no
pressure is present, contact local Trane service.
Note: Verification must be done by gauges. Do NOT
rely only on values from unit controls.
3. Piping
Water piping flushed before making final
connections to the system
Chilled water piping connected to:
Evaporator
Pumps
Flow switch or flow proving device installed
(if not factory provided)
Strainer installed and cleaned
Water supply connected to filling system
Does unit have freeze inhibitor? If unit has freeze
inhibitor:
Verify type and concentration is correct per unit
submittal
Calculate and record freeze point of the
solution: __________
Systems filled
Pumps run, air bled from system
Relief valve ventilation piping installed (if
applicable)
4. Flow balancing valves installed
Leaving chilled water
5. Gauges, thermometers, and air vents
Installed on both sides of evaporator
6. Electrical
Wire size per submittal and NEC table
310.15(B)(16)
Full power available
Interconnecting wiring, starter to panel (as required)
External interlocks (flow switch, pumps auxiliary,
etc.)
Chilled water pump (connected and tested)
115 Vac power available for service tools
All controls installed and connected
Power distribution grounding type identified:
Solidly Grounded (Center Ground Wye)
-or-
Non-Solidly Grounded (Any Delta, High
Impedance Ground, or Ungrounded Wye
Important: When the unit is connected to a corner-
grounded supply, completely remove
ground wire(s) 1004B/2004B from
surge arrestor components 1FA1 and
2FA1 on subpanel(s). See schematic
for details.
Log and Check Sheets

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Trane Ascend ACR C Series and is the answer not in the manual?

Trane Ascend ACR C Series Specifications

General IconGeneral
BrandTrane
ModelAscend ACR C Series
CategoryChiller
LanguageEnglish

Related product manuals