EasyManuals Logo
Home>Trane>Chiller>CVHG

Trane CVHG Installation Instructions

Trane CVHG
48 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #28 background imageLoading...
Page #28 background image
Installation
28 AFDH-SVN03H-EN
10. Once the upper Z-bracket is secured, leave the lift
rigging in place and attach a C-clamp to the adapter
bracket and panel supports to hold the adapter bracket
in place.
11. Use a lubricated 3/8-inch drill bit and drill through the
mounting brackets on the evaporator at both of the
slots located on the adapter bracket.
Figure 20. Attaching the Z-bracket at the top of the
panel
Figure 21. Attaching C-clamp to the adapter bracket

Table of Contents

Other manuals for Trane CVHG

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Trane CVHG and is the answer not in the manual?

Trane CVHG Specifications

General IconGeneral
BrandTrane
ModelCVHG
CategoryChiller
LanguageEnglish

Related product manuals