wc_tx003048gb.fm
34
Maintenance BS 50-2
5.4 Checking the Fuel Lines and Fittings
When
Daily before starting the machine
Procedure
1. Check the fuel lines (a) and fittings (b) for cracks and leaks.
2. Repair or replace components as needed.
Result
The fuel lines and fittings have now been checked.
5.5 Maintaining the Shoe Hardware
When
On new machines, or after replacing shoe, check and tighten shoe hardware after
the first five hours of operation. Inspect hardware every week thereafter.
Procedure
Torque hardware as specified.
Cast Iron Shoe Plastic Shoe
wc_gr008985
a
a
b
a
b
T1
T1
T5
T3
T3
T5
wc_gr005385
Torque Nm ft.lbs.
T1 86 63
T3 19 14
T5 78.7 58