4-2 BA EZ17 en* 1.1 * ez17i400.fm
4 Putting into operation
Rear tarpaulin (option)
Installing/removing
1. Stop and park the machine. Stop the engine. See “Preparing
lubrication”.
2. Roll up the rear tarpaulin and secure it with both straps A.
3. Push the rear tarpaulin into the frame or pull it out of the rail under it.
Hooks B must show inward (see figure 43).
Fig. 41
A
Fig. 42
Fig. 43 (shown inside)
B

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Wacker Neuson E13-01 and is the answer not in the manual?

Wacker Neuson E13-01 Specifications

General IconGeneral
BrandWacker Neuson
ModelE13-01
CategoryExcavators
LanguageEnglish

Related product manuals