1A-23
G50/G70/G85 OPERATION 1A
1.26 Before Starting
Before putting the generator into service, review each item on the following checklist. Because generators are often
run for long periods of time unattended, it is important to make sure that the unit is set up properly to reduce possible
problems.
Check for any damage that might have been caused during shipping or towing.
Check to make sure no debris has lodged in or near radiator (both sides) or fan.
Check that generator is level.
Chock trailer wheels.
Check that generator is grounded to a good earthen ground per NEC and local regulations.
Check engine oil, coolant and fuel levels, and fill as required.
Determine voltage needs. Set voltage selector switch and make correct terminal connections.
Check that all electrical connections were made in compliance with local regulations and NEC standards.
Check fan belt and hoses on engine for loose connections or fraying. Tighten or replace as required.
Close and secure side panel access doors.
Review and follow safety instructions found in the front of this manual.
Failure to follow the procedures listed may cause injury to personnel or damage to the generator. Be certain that
all persons setting up the generator are certified or fully trained on the installation of the generator.
WARNING

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Wacker Neuson G70 and is the answer not in the manual?

Wacker Neuson G70 Specifications

General IconGeneral
BrandWacker Neuson
ModelG70
CategoryPortable Generator
LanguageEnglish

Related product manuals