Operation
Preparing the Machine for First Use 6.1
31
[en-US] | 09/2022 | 5100061327 | RTLx-SC3 | Operator’s Manual
6 Operation
6.1 Preparing the Machine for First Use
Requirement
Machine on level surface
Procedure
1. Remove all loose packaging materials from the machine.
2. Check the machine and its components for damage. If there is visible
damage, do not operate the machine. Contact the dealer immediately
for assistance.
3. Take inventory of all items included with the machine and verify that all
loose components and fasteners are accounted for.
4. Connect component parts not already attached.
5. Add fluids as needed and applicable, such as fuel, engine oil, and hy-
draulic oil.
6. Move the machine to its operating location.
6

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Wacker Neuson RTLx-SC3 and is the answer not in the manual?

Wacker Neuson RTLx-SC3 Specifications

General IconGeneral
BrandWacker Neuson
ModelRTLx-SC3
CategoryConstruction Equipment
LanguageEnglish

Related product manuals