1. System Installation Requirements
1-2
TI 32P01J10-01EN
1.1 Control Room Design
Control rooms, in which the system control equipment is to be installed, should be
designed in accordance with the following conditions:
General
In designing a control room, ensure adequate oor strength and air conditioning including dust-
and moisture-proong.
SEE
ALSO
• 1.1 Control Room Design Air Conditioner
• 1.2 Control Room Environment Air Purity
Applied Standards (Table Installation Environment Specications)
Floor Strength and Space
The oor should have adequate strength, and you should design the layout in accordance with
the weight and size of equipment to be installed.
SEE
ALSO
• For the maintenance space required, refer to 2.4, “Servicing Area.”
• For the weight and dimensions of standard equipment, refer to applicable general specications.
Floor Structure
To prevent damage to cables by operators and maintenance equipment, do not lay cables on the
oor.
Lay cables under the oor as follows:
• Provide an “accessible” oor which also facilitates maintenance work.
• Make cable pits under the oor if it is concrete.
Flooding- & Dust-proof Floor
To protect equipment and cables, design a ooding-proof oor.
After the cabling is completed, seal all cable conduits using putty to prevent intrusion of dust,
moisture, rats, and insects into the equipment.
Nov. 27, 2015-01