Home
Zephyr
Ventilation Hood
ALU-E43ASX
Zephyr ALU-E43ASX User Manual
5
of 1
of 1 rating
15 pages
Give review
Manual
Specs
To Next Page
To Next Page
To Previous Page
To Previous Page
Loading...
- 17 -
PREPARE THE HOOD
1.
Open the perimeter panels and remove the
grease filters. See Fig.10.
2.
Remove the control panel unscrewing the
(4) screws 3,9x6 mm. See Fig.11.
3.
Remove the (2) interiors panels unscrewing
the (8+8) screws. See Fig.12.
FIG.10
FIG.11
FIG.12
(4) MOUNTING SCREWS
(3.9 x 6 mm Flat Head)
4
6
Table of Contents
Installing the Ductwork: Remote Blower
2
Installing the Ductwork: Internal Blower
3
Hood with 2 Internals Blowers
3
Hood with 1 Internal Blower
3
Prepare the Ceiling Opening
4
Prepare the Hood Support
4
Prepare the Hood
5
Installation Internal Blower
6
Hood with 1 Internal Blower (Only Ducting Version)
6
Hood with 1 Internal Blower (Ducting and Non-Ducting Version)
7
Installation Brackets (Only Non-Ducted Version)
7
Hood with 2 Internal Blowers
8
Connect the Wires (1 Internal Motor)
9
Connect the Wires (2 Internal Motors)
9
Installation External and In-Line Blower
10
Connect the Wires (External and In-Line Blower)
11
If You Choose “B” Air Outlet
11
Install the Hood
12
Wiring (Hood with Internal Blower/S)
12
Wiring (External and In-Line Blower)
13
External Blower Connection
13
Complete the Installation
14
Install the Air Return Vent (Non-Ducted Version)
14
Mesh Filters
15
5
Based on 1 rating
Ask a question
Give review
Questions and Answers:
Need help?
Do you have a question about the Zephyr ALU-E43ASX and is the answer not in the manual?
Ask a question
Zephyr ALU-E43ASX Specifications
General
Brand
Zephyr
Model
ALU-E43ASX
Category
Ventilation Hood
Language
English
Related product manuals
Zephyr ALL-M90BBX
56 pages
Zephyr AK9800
21 pages
Zephyr AK7000
8 pages
Zephyr AK11005
64 pages
Zephyr AK7636AS
48 pages
Zephyr AK7000BS
60 pages
Zephyr AK7048BS
60 pages
Zephyr AK9234BS
88 pages
Zephyr AK9234AS
25 pages
Zephyr AK6500 series
15 pages
Zephyr Typhoon AK2100
19 pages
Zephyr Typhoon AK2136CS
36 pages