Installation and commissioning guide
2750 515-1 EN, REV. 14, 2020-06-26
43
4.7 Installation with draw rod at site
4.7.1 Preparations at site
Overview
This procedure is only applicable if the lower draw rod with the bottom contact (36) is installed in the
transformer.
G004532
Procedure
1. Loosen the M8 bolts (24).
G004684
2.
Remove the M10 bolts (6), and then remove the
outer terminal (5).
G004691

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the ABB GOE Series and is the answer not in the manual?

ABB GOE Series Specifications

General IconGeneral
BrandABB
ModelGOE Series
CategoryIndustrial Equipment
LanguageEnglish

Related product manuals