INSTALLATION
Vecto r H® S eries ▪ Opera tor’s Manual ▪ M N-462 9 5 ▪ Rev 7 ▪ 6/22
44
Continued from previous page
9. Rotate the rack and lower it into the slots on the shelf.
Attach the rack to the shelf with cotter pins.
10. Repeat the process for the other rack.
Installing the oven
on a stand
11. Lift the oven using an appropriate lifting device. Remove the feet a, or if
the unit has casters
b, remove them including the mounting plates.
Continued on next page
NOTE: Expand the cotter pin after inserting it through
the hole.